Today I decided I was going to work on the cabinets and other interior fittings.  First up was pretty easy.  I drilled the hole for the drain line going to the sink that I have yet to install.  The Countertops should be fully cured by this weekend, so hopefully we can get those installed soon!

Not much to look at, but there it is! I’m still pleased with my tie down straps
Trim to suit install

That took maybe 15 minutes.  Next up were the actual cabinet doors.  The hinges were a pain to set up and get aligned, but I think that’s pretty common with hinges.

First side goes here.
hinges!
Other side goes here. Painter’s tape so I can get them open again easily. Lessons have been learned…
They work!
Lots of room for storage
The final product
The interior is getting really close!!!

The final part I needed for the water supply to the tank came in today. It didn’t fit like I thought it would, but I used a spare piece of the water tubing as a spacer. Problem solved!

Done!

I also got the floor trimmed to fit in its spot.  Two corners needed to be cut out.  It fits in there great, but the piece of wood itself is so warped that it doesn’t fit worth a crap.  We will probably screw it down when we know we’re done inside there.

That really finishes that off! It does need a floormat though.

Not bad for a Tuesday after work!