We unintentionally took a few days off of working on the camper. The smoke from the wildfires up here is still stifling and we didn’t think it was a good idea to spend a lot of time outside.
I did finally get around to ordering a power inverter so I can run my coffee pot, but it ended up being too big to mount in the spot we had picked out so I had to mail it back and order another one. Hopefully by the weekend I can have that put in.
The biggest thing we got done today is install the LED lights in the camper! We ordered 2 rolls of flexible LED “tape”. It was super easy to install and we finally got to hook something up to the switch panel!
I would consider that a success! The wiring is so close to being done now!
I did work on a few small items today as well. We test fit the floor for the dinette the other day and realized that the board was super warped. I added another piece of wood on the inside of the water tank area so we can screw the floor down. Didn’t get any pictures of it though! I also added reinforcement to the underside of my seat. I thought it would be cool to use the thin plywood, but underestimated how heavy I am. This should fix the sad creaking noise it made when I sat on it!